Specification to Microarchitecture
Translate product intent into measurable requirements, interface contracts, block ownership, performance budgets, and deliberate PPA tradeoffs.
- Requirements
- Interface contracts
- PPA budgets
Specification to signoff
ASIC design turns behavior, performance targets, and physical constraints into manufacturable silicon. This guide connects the decisions made at each stage so that RTL is not treated separately from timing, power, verification, or implementation.
Build a mental model of the complete design flow and understand what each stage must prove before tapeout.
Coverage map
Follow the decisions in order, or open the module that matches the problem in front of you.
Translate product intent into measurable requirements, interface contracts, block ownership, performance budgets, and deliberate PPA tradeoffs.
Express the partitioned design as deterministic, synthesizable RTL with explicit state, datapaths, pipelines, and flow control.
Engineer safe boundaries between clock and power domains while making reset behavior explicit and verifiable.
Constrain the real design, inspect synthesis quality, and close setup and hold timing across operating corners.
Carry logical intent through floorplanning, placement, routing, DFT, extraction, and final signoff checks.
Apply the concepts
Use the question bank to explain assumptions, debug failures, and validate tradeoffs in the language interviewers expect.
ASIC design, end to end
A reliable ASIC flow carries requirements, interface contracts, and PPA budgets forward instead of rediscovering them after RTL. Each stage should make the next stage easier to constrain, verify, and close.
Use this guide to connect microarchitecture, clock and reset intent, synthesis, static timing analysis, physical design, DFT, and final signoff into one engineering argument.