DescriptionQ391
Q391DesignGoogleASIC interview problem
Choose a localized IR-drop repair
TechniquesDesignPhysical designIR dropPower integrity
DifficultyMedium
TopicPhysical Design
LanguageSystemVerilog
Format4 choices
01
Problem
Sign-off shows a small cluster with dynamic IR drop beyond the limit. Timing slack is +180 ps, routing congestion is low, and the global power grid meets limits elsewhere. Which first change most directly targets the problem with the least unrelated disruption?
02
